;
Thairath Online
Thairath Online

26 Khlong Saen Saep Boats Mobilized to Push Water into Rama IX Tunnel Service Expected to Resume in 48 Hours

Governmentpolicy30 Sep 2026 13:50 GMT+7

Share

26 Khlong Saen Saep Boats Mobilized to Push Water into Rama IX Tunnel Service Expected to Resume in 48 Hours

Krob Krua Transport has deployed 26 boats to accelerate pushing water from Khlong Saen Saep into the Rama IX tunnel. Water levels have recently dropped by 30 cm. The company expects to resume passenger boat services within 48 hours, awaiting an official announcement.

Krob Krua Transport has mobilized 26 boats to speed up pushing water in Khlong Saen Saep.

Due to high water levels in Bangkok affecting passenger boat services, the latest update is as follows. Mr. Chaowalit Methayaprapas, owner of Krob Krua Transport (2002) Co., Ltd., also known as "Uncle Tua". The operator of Khlong Saen Saep passenger boats revealed that water levels in Khlong Saen Saep remain quite high, preventing normal service resumption. The company has therefore mobilized 26 passenger boats to help push water along the canal, and recently added 3 boats at Khlong Prawet Burirom to systematically accelerate water drainage and improve flow into Bangkok's main drainage system.

Focus on Rama IX tunnel – water level down by 30 cm.

The strategic target for pushing water is the Rama IX–Ramkhamhaeng drainage tunnel, a main route discharging water into the Chao Phraya River. This tunnel has a diameter of about 5 meters and can handle up to 200,000 cubic meters of water per day.

Mr. Chaowalit explained that while using boats to push water does not directly remove water entirely, it increases the speed of water flowing into the tunnel, akin to opening a "highway" for the large water mass. Since starting this operation, water levels in Khlong Saen Saep have dropped by approximately 30 centimeters.

If water levels continue to fall and the drainage system operates at full capacity, it will help floodwaters in communities and narrow alleys flow faster into canals and the tunnel system, thus alleviating overall flooding conditions.

Service expected to resume within 48 hours.

Regarding plans to resume normal passenger boat service, it is initially expected to reopen within 2 days, or about 48 hours from now. However, this depends on effective management and lowering water levels in the canal to ensure maximum passenger safety.

/ Krob Krua Transport (2002) Co., Ltd. The company urges regular passengers to closely monitor updates as it continuously assesses the water situation and readiness before officially announcing the date and time for service resumption.

Read more news " Government policy " updates