;

Phiphat Ratchakitprakarn officially opened Hutchison Port's fully operational Terminal D at Laem Chabang Port, with the capacity to handle 3.5 million TEUs per year, highlighting the remote-controlled crane system to position Thailand as a regional logistics hub.
Mr. Phiphat Ratchakitprakarn, Deputy Prime Minister and Minister of Transport, presided over the inauguration ceremony of Terminal D of Hutchison Port Thailand at Laem Chabang Port, Chonburi Province. The event was attended by Mr. Sanphet Boonyamanee, Deputy Minister of Transport; Mr. Jirapong Tepthitak, Director of the Port Authority of Thailand (PAT) and Acting Director of Laem Chabang Port, representing the Eastern Economic Corridor Policy Committee; Mr. Stephen Ashworth, Managing Director of Hutchison Port Thailand for Southeast Asia and Australia; and representatives from the international freight transport sector.
Terminal D was completed and has been fully operational since March 2026, with the capacity to handle 3.5 million TEUs annually. This expansion strengthens Laem Chabang Port’s ability to accommodate large container ships. As Thailand’s main import-export port, it is integral to logistics infrastructure development within the Eastern Economic Corridor (EEC).
Mr. Phiphat Ratchakitprakarn, Deputy Prime Minister and Minister of Transport, said, “The opening of Terminal D by Hutchison Port Thailand marks a significant step in developing Thailand’s logistics infrastructure through public-private collaboration. It enhances port and maritime freight industry capabilities, builds confidence, and boosts the country’s economic competitiveness.”
He added, "The government and Ministry of Transport continue to develop Laem Chabang Port to seamlessly connect road, rail, water, and air transport. This will reduce logistics costs and increase economic opportunities. Terminal D is expected to support the Eastern Economic Corridor’s development and help position Thailand as the region’s transportation and logistics hub.”
Mr. Jirapong Tepthitak, Director of the Port Authority of Thailand (PAT), stated, “The full operation of Terminal D is a commendable achievement for Hutchison, a partner that has elevated Thailand’s port standards for 25 years by introducing advanced technology and automation to enhance Laem Chabang Port’s international trade capacity.”
He added, “The PAT’s next step is to develop Laem Chabang Port Phase 3, including Terminals E and F, to increase container handling capacity, implement automation technology, and improve multimodal transport connectivity. The PAT is ready to collaborate with terminal operators to support future maritime freight growth.”
Terminal D spans approximately 770,000 square meters, with a total quay length of 1,700 meters and a depth of 16 meters from mean sea level. It features 17 remote-controlled quay cranes capable of handling three Super Post-Panamax container vessels simultaneously. Inside the container yard, there are 48 additional remote-controlled cranes, automated container inspection gates, and autonomous and electric yard tractors with battery swap stations, enabling 24-hour operations.
Hutchison is the first operator in Thailand to deploy remote-controlled container cranes. During the event, Mr. Phiphat visited the crane control center, which manages container handling from a central operations room, enhancing efficiency and accuracy. The use of electric equipment is also part of Hutchison Port’s carbon emission reduction plan.
Currently, Hutchison Port Thailand operates Terminals A2, A3, C1, C2, and Terminal D at Laem Chabang Port, with integrated road and rail transport connections supporting Thailand’s import and export activities. The full operation of Terminal D will increase Laem Chabang Port’s capacity to handle the growing volume of containers in the future.
Read more news " State Policy " updates