Thairath Online
Thairath Online

Metropolitan Waterworks Authority Announces Areas with No or Low Water Pressure on 8 June 2026 — Check Impacted Locations

Society07 Jun 2026 16:45 GMT+7

Share

Metropolitan Waterworks Authority Announces Areas with No or Low Water Pressure on 8 June 2026 — Check Impacted Locations

The Metropolitan Waterworks Authority (MWA) announced areas with "no water flow or low water pressure" on 8 June 2026 in Bangkok and Nonthaburi; check which locations are affected.

Reporters noted that the websiteof the Metropolitan Waterworks AuthorityorMWAhas announced areas experiencing no water flow or low water pressure on 8 June 2026 due to maintenance of water pipes, pipe joint disconnections, pressure adjustments, and shutdowns for pump station and water treatment plant upgrades. Details are as follows:

Notification of no water flow on 8 June 2026 at work sites (Bangkok and Nonthaburi areas):

1. Along the even-numbered side of Bang Khun Non Road

  • On 8 June 2026 from 10:00 to 16:00, pipe joint disconnection for a 300 mm PVC pipe will occur.
  • Affected areas: Thepharak and all Soi Warocha.

2. Maneeya Village on Rattanathibet Road and Tha It Road

  • On 10 June 2026 from 10:00 to 16:00, with DMA system operations on 9 June 2026; pipe size: 315 mm HDPE.
  • Affected areas: Bang Bon 4, odd-numbered side of Bang Bon 4, all alleys from Khlong Rang Phai to Khlong Nam Daeng.

3. Shutdown of Maha Sawat water treatment plant for maintenance of electrical equipment and high-voltage systems.

  • On 8 June 2026 from 22:00 until 05:00 on 9 June 2026, shutdown of pumping station/water treatment plant; pipe size: not specified.
  • Affected areas: Water flow will be low to none in Bangkok districts: Thawi Watthana, Bang Phlat, and Talat Khan (only Talat Khan and Chim Phli subdistricts); Nonthaburi districts: Sai Noi, Bang Bua Thong, Bang Yai, Bang Kruai, Pak Kret (only Khlong Khoi, Bang Phlap, Khlong Phra Udom, Bang Tanai, Om Kret, Tha It subdistricts), and Mueang Nonthaburi (only Sai Ma, Bang Rak Noi, Bang Si Mueang, Bang Phai, Bang Krang subdistricts).

4. Shutdown of Maha Sawat water treatment plant to inspect and repair a 1500 mm main pipe.

  • On 8 June 2026 from 22:00 until 05:00 on 9 June 2026 due to a pipe rupture; pipe size: 1500 mm ST.
  • Affected areas: Water flow will be low to none in Bangkok districts: Thawi Watthana, Bang Phlat, and Talat Khan (only Talat Khan and Chim Phli subdistricts); Nonthaburi districts: Sai Noi, Bang Bua Thong, Bang Yai, Bang Kruai, Pak Kret (only Khlong Khoi, Bang Phlap, Khlong Phra Udom, Bang Tanai, Om Kret, Tha It subdistricts), and Mueang Nonthaburi (only Sai Ma, Bang Rak Noi, Bang Si Mueang, Bang Phai, Bang Krang subdistricts).