Thairath Online
Thairath Online

Metropolitan Waterworks Authority Announces Areas with No or Low Water Pressure on 9 June 2026: Check Affected Locations

Society08 Jun 2026 17:22 GMT+7

Share

Metropolitan Waterworks Authority Announces Areas with No or Low Water Pressure on 9 June 2026: Check Affected Locations

The Metropolitan Waterworks Authority (MWA) Announces areas with "no water flow or low water pressure" on 9 June 2026 in Bangkok and Nonthaburi. Check which locations are affected.

Reporters have noted that the websiteof the Metropolitan Waterworks AuthorityorMWAhas announced areas experiencing no water flow or low water pressure on 9 June 2026 due to water pipe maintenance, pipe joint cutting, pressure adjustments, and suspension of pumping station and water treatment plant operations, with details as follows:

Announcement of water outage on 9 June 2026 at work sites (areas in Bangkok, Samut Prakan, and Nonthaburi)

1. Suksawat-Ku Sang, Khong Son, Village No. 7 and 9

  • On 9 June 2026 from 09:00 to 17:00, pipe joint cutting on a 300 mm PVC pipe.
  • Affected areas: Suksawat-Ku Sang, Khong Son, Village No. 7 and 9, from Wat Ku Sang to Bhumjai Niwet 1 Village entirely.

2. Soi Nonthaburi 11/2

  • On 9 June 2026 from 10:00 to 15:00, pipe joint cutting.
    Pipe size: 150 mm PVC.
  • Affected areas: Nonthaburi 1 Road (right side) from Phra Nang Klao Bridge intersection to Soi Nonthaburi 9/1 entirely.

3. Ramkhamhaeng 80

  • On 9 June 2026 from 10:00 to 15:00, pipe joint cutting.
    Pipe size: 150 mm PVC.
  • Affected areas: Ramkhamhaeng area, water outage from Ram 80 to Ram 70 including all intersections and alleys.

4. Soi Roem Charoen, Sukhumvit 31

  • On 9 June 2026 from 10:00 to 15:00, pipe joint cutting.
    Pipe size: 100 mm PVC.
  • Affected areas: Left side of Sukhumvit 31 intersection entirely.

5. Bang Khun Non Road, odd-numbered side

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 300 mm steel tube (ST).
  • Affected areas: Bang Khun Non Road, odd-numbered side, from Bang Khun Non 21 to 27.

6. Soi Village Phanu

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 200 mm PVC.
  • Affected areas: Phanu Land Village project, roadside in the village and adjacent alleys.

7. Suphapburut Road

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 300 mm asbestos cement (AC).
  • Affected areas: Suphapburut Road, roadside from Khunlai Village entrance to Liap Khlong Noen Sai Road.

8. Charansanitwong 71, Intersection 7

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 100 mm asbestos cement (AC).
  • Affected areas: Charansanitwong 71, between intersections 3 and 7.

9. Taksin Road, Soi 34 (Kor Chun Huad shop)

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 150 mm asbestos cement (AC).
  • Affected areas: Taksin Road, Soi Taksin 34, including Kor Chun Huad shop area.

10. Wutthakat Road, Soi 47

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 150 mm asbestos cement (AC).
  • Affected areas: Wutthakat Road, Soi Wutthakat 47 entirely.

11. Thian Thale Road, Khlong Yai Phian

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 150 mm asbestos cement (AC).
  • Affected areas: Thian Thale Road from Soi Thian Thale 28 to Khunlai Village and Taweet School.

12. Inthraphithak Road, Soi Wat Yai Srisuphan 2

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 150 mm asbestos cement (AC).
  • Affected areas: Inthraphithak Road from Soi Wat Yai Srisuphan, including Ton Wa, Ton Yang, and Phun Sap alleys.

13. Charoen Nakhon Road, Soi 50

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 400 mm asbestos cement (AC).
  • Affected areas: Charoen Nakhon Road from Soi 48 to Soi 52 entirely.

14. Viphavadi Forest Park

  • On 9 June 2026 from 10:00 to 16:00, water meter installation.
    Pipe size: 200 mm asbestos cement (AC).
  • Affected areas: Mit Maitri area, Mit Maitri Road beside Viphavadi Forest Park.

15. Samakkhi 65 Soi, Prachanivet 2 Phase 3

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 200 mm PVC.
  • Affected areas: Samakkhi Road, including Soi Samakkhi 65, Prachanivet 2 Phase 3 entirely.

16. Soi Krungthep Non 2, Intersection 5

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 200 mm PVC.
  • Affected areas: Entire Soi Krungthep Non 2 area.

17. Sai Thong 7 and Soi 20, Tiwanon Road

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 100 mm PVC.
  • Affected areas: Tiwanon Road including Soi Tiwanon 45, Sai Thong, Premruethai and all connecting alleys from Sai Thong 3 through Sai Thong 5, 7, 9, 9/1, 9/3 to Premruethai 30; also Sai Thong 16 through Sai Thong 18, 20, 22, and 24.

18. Nonthaburi 33 Soi (Soi Wat Chomphu Wet 5), Sanam Road

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 100 mm PVC.
  • Affected areas: Sanambin Nam Road from the entrance of Soi Nonthaburi 33 (Soi Wat Chomphu Wet) left side to Wat Chomphu Wet entrance and adjacent Soi Wat Chomphu Wet.

19. Soi Charoen Krung 67, Charoen Krung Road

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 300 mm PVC.
  • Affected areas: Left side of Soi Charoen Krung 67 from entrance to Saeng Chan Market area, including connecting alleys between Soi Charoen Krung 67 and 65, and The Station buildings 1 and 2.

20. Soi Yaek Khang Thob 12, Charoen Mueang Road

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 100 mm PVC.
  • Affected areas: Charoen Mueang Road from Rong Muang Road to Charu Mueang Road and Salak Hin community.

21. Ekachai Road

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 300 mm PVC.
  • Affected areas: Ekachai Road and its roadside.

22. Ram Inthra 89 Soi

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 400 mm PVC.
  • Affected areas: Ram Inthra area, Soi Ram Inthra 79/1 to 91/1, Intrarath Hospital, and ANB Laboratory Company.

23. Lotus On Nut 80, Sukhumvit 77 Road

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 300 mm PVC.
  • Affected areas: Sukhumvit 77 Road, Soi On Nut 78 to 84 including side alleys.

24. Soi On Nut 40, Sukhumvit 77 Road

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 150 mm PVC.
  • Affected areas: Sukhumvit 77 Road, Soi On Nut 36 to 40 including side alleys.

25. Khlong Krathum, Nam Daeng - Bang Phli Road

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 300 mm steel tube (ST).
  • Affected areas: Nam Daeng to Bang Phli Road, Soi Nam Daeng to Bang Phli 2 to 36 including side alleys.

26. Songprapha 2 Intersection 2 to Sornakom 8

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 150 mm PVC.
  • Affected areas: Songprapha Road, Tal Koo community, Soi Tawee Wat 2-4, Airport Condo, and Thai Teachers Cooperative Housing.

27. Soi Lat Pla Khao 72 Intersection 4, Lat Pla Khao Road

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 200 mm PVC.
  • Affected areas: Soi Lat Pla Khao 72, intersections 2-14, and Soi Ram Inthra 8 intersections 14-24.

28. Soi Chaeng Watthana 4, Phahonyothin Soi

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 300 mm PVC.
  • Affected areas: Soi Chaeng Watthana 4 on Chaeng Watthana Road to Phahonyothin 57 Road, including Phahonyothin Road.

29. In front of Supalai Village Soi

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 300 mm steel tube (ST).
  • Affected areas: Keha Bang Phli Road, Lad Wai Road inbound from Klong Na Kluea to Sukhumvit Road.

30. In front of Sai Rung Village

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 300 mm PVC.
  • Affected areas: Phraek Sa area, outbound Phraek Sa Road from entrance to Khlong Khaek.

31. Soi Bang Phli Phatthana

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 200 mm PVC.
  • Affected areas: Thep Rak and all of Bang Phli Phatthana.

32. Suhra Khlong Nueng Road

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 200 mm asbestos cement (AC).
  • Affected areas: Suhra Khlong Nueng from Baliya-Ram Inthra Village to The Willow Townhome Village entirely.

33. Entrance of Soi Phraya Suren 3

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 300 mm asbestos cement (AC).
  • Affected areas: Phraya Suren Road from Soi Phraya Suren 3 to Soi 7 entirely.

34. Suwinthawong Road

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 200 mm PVC.
  • Affected areas: Suwinthawong Soi 13 from Soi 11 to Soi 13 entirely.

35. Soi Ban Ko Phichit

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 150 mm PVC.
  • Affected areas: Entire Soi Ban Ko Phichit and roadside along Khlong Chorakhe Yai from Soi Ban Ko Phichit.

36. 200 Years Intersection Road

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 50 mm PB pipe.
  • Affected areas: On Nut, Theparat, 200 Years Intersection.

37. Along Khlong Hua Mak (Pattanakarn 32)

  • On 9 June 2026 from 10:00 to 16:00, pipe joint cutting.
    Pipe size: 300 mm asbestos cement (AC).
  • Affected areas: Pattanakarn Road, Pattanakarn 32 Soi left side to Khlong Hua Mak and Sirani Village.

38. Rattanathibet Village

  • On 9 June 2026 from 10:00 to 16:30, pipe joint cutting.
    Pipe size: 300 mm asbestos cement (AC).
  • Affected areas: Rattanathibet area.

39. Soi Wat Saimai Nuea - Wat Saimai Tai

  • On 9 June 2026 from 10:00 to 16:30, pipe joint cutting.
    Pipe size: 200 mm MT-PVC.
  • Affected areas: Ban Saimai Road, Soi Wat Saimai Nuea to Wat Saimai Tai.

40. Suksawat Village

  • On 9 June 2026 from 10:00 to 16:30, pipe joint cutting.
    Pipe size: 150 mm PVC.
  • Affected areas: Bang Kruai-Sai Noi Road, Soi Suksawat Village.

41. Commercial Building Project, 8 rooms

  • On 9 June 2026 from 10:00 to 16:30, pipe joint cutting.
    Pipe size: 150 mm PVC.
  • Affected areas: Atcharaya Prasit Road and its alley.

42. Along Wat Sak Canal

  • On 9 June 2026 from 10:00 to 16:30, pipe joint cutting.
    Pipe size: 150 mm PVC.
  • Affected areas: Bang Kruai-Jong Thanom Road, along Wat Sak Canal alley.