;
Thairath Online
Thairath Online

Metropolitan Waterworks Authority Announces Water Outage and Low Pressure Areas on 28 October 2026: Check Affected Locations

Society27 Oct 2026 16:00 GMT+7

Share

Metropolitan Waterworks Authority Announces Water Outage and Low Pressure Areas on 28 October 2026: Check Affected Locations

The Metropolitan Waterworks Authority (MWA) announces areas with "no water flow and low water pressure" tomorrow, 28 October 2026, in Bangkok, Nonthaburi, and Samut Prakan. Check which areas will be affected.

Reporters state that the websiteof the Metropolitan Waterworks AuthorityorMWAannounces areas with no water flow or low water pressure on 28 October 2026 due to pipeline maintenance, pipe connection cuts, pressure adjustments, and suspension of pumping station and water plant upgrades, with details as follows.

Announcement of no water flow on 28 October 2026 at work sites (Bangkok and Samut Prakan areas)

1. Soi Thai Prakan

  • On 28 October 2026 from 10:00 to 15:30, pipeline connection cut
    Pipe size: 300 PVC
  • Affected area: Thepharak Soi Thai Prakan 3, entire area

2. Thetsaban Bang Pu 93/1

  • On 28 October 2026 from 10:00 to 16:00, water meter installation
    Pipe size: 300 PVC
  • Affected area: Sukhumvit Soi Thetsaban Bang Pu 93/1, entire soi

3. Near Khlong Phra Ong Chao, outbound side, PTT gas station

  • On 28 October 2026 from 10:00 to 16:00, pipeline connection cut
    Pipe size: 400 HDPE
  • Affected area: Along Bang Na-Trat Road outbound from Khlong Phra Ong Chao to Khlong Satharanprayoet at km 30+293

4. Rama 3 Road near Nang Linchi intersection

  • From 28 October 2026 10:00 to 29 October 2026 05:00, pipe rupture repair
    Pipe size: 600 ST
  • Affected area: Rama 3 Road from Soi 77 to Chuea Phloeng Road // Chuea Phloeng Road from Rama 3 intersection to Rama 4 Road // Rama 4 Road from Chuea Phloeng intersection to Ngamduplee Soi, Sri Bamphen Soi // Suwan Sawat Soi // Mek Sawat Soi // Sri Aksorn Soi // Phaya Phiren Soi

5. Along Charansanitwong Road

  • From 28 October 2026 10:00 to 29 October 2026 02:00, step testing
    Pipe size: 300 PVC
  • Affected area: Charansanitwong Road, Borommaratchachonnani Road, Borommaratchachonnani Soi 2, Charansanitwong Soi 49 to Soi 57/3